The Gremyashchy-class corvette (Russian: гремящий – "thunderous") is an advanced development of the Steregushchy-class corvette of the Soviet Navy. This follow-on project was designed by the Almaz Central Marine Design bureau in Saint Petersburg. The first ship was laid down on March 26th, 2011 and the official ceremony took place on February 2nd, 2012.
Specifications[]
- Type: Corvette
- Service Period: 2015-
- Characteristics:
- Length: 343 feet (104.55 meters)
- Beam: 36 feet (10.97 meters)
- Draught: 12 feet (3.66 meters)
- Displacement: 2,200 tons
- Crew:
- Endurance:
- Installed Power: AC 380/220V, 50 Hz, 4x630 kw diesel genset
- Propulsion: 2 shaft CODAD, 4 Kolomna 16D49 diesels 23,664 hp (17.6 MW)
- Range: 3,800 nautical miles (7,037.6 kilometers) at 14 knots (25.93 km/h)
- Speed: 26 knots (48.15 km/h)
- Sensor Suite:
- Furke-E 3D Air Search RDF
- Garpun-B/3Ts-25E/PLANK SHAVE Surface Search RDF
- Monument targeting RDF
- Ratep 5P-10E Puma Gunfire Control RDF
- HOT FLASH RDF
- Zarya-ME bow mounted ASDIC suite
- Vinyetka low frequency active/passive towed array ASDIC
- Countermeasures:
- TK-25E-5 ECM
- 4 x PK-10 decoy
- Armament:
- 1 x Arsenal A-190 100mm naval gun
- 2 x MTPU 14.5mm pedestal mounted machine gun
- 2x8 Redut VLS cells
- 2 x AK-630M CIWS
- 1x8 VL P-800 Oniks or
- 1x8 VL 3M-54 Klub(91RE2) or
- 1x8 SS-N-29 /Medvedka-VE anti-sub missile
- 2x4 400mm torpedo tubes (for Paket-NK)
- Aircraft Carried: 1 x Kamov Ka-27 helicopter
Unit Run[]
- SVK Gremyashchy
- SVK Provornyy
- SVK Buyniy - under construction
- SVK Razumnyy - under construction
- SVK Bystriy - under construction
- SVK Retivy - under construction
- SVK Unnamed - planned for construction
- SVK Unnamed - planned for construction